Skip to main content

Offshore platforms

HVAC parts for fixed platforms, wellhead platforms and accommodation modules.

Offshore HVAC keeps control rooms pressurised, equipment rooms cool and people safe. A missing part can mean a helicopter seat, a shutdown or a safety case deviation. We supply the right part, with the right papers, to the supply base on time.

What we supply most often

  • Fire, blast and gas-tight dampers
  • Ex-rated fan motors and duct heaters
  • Control room pressurisation parts
  • Salt-air intake filtration

Site conditions we plan for

Hazardous areas

Motors, heaters, actuators and instruments must match the zone, gas group and temperature class of the installation.

Salt-laden air

Coils, fans and enclosures need marine-grade materials and coatings to survive.

Limited deck space and lift windows

Parts must arrive complete, correctly packed and labelled for the next vessel or flight.

Send us a part number. We send you a quote.

Add as many lines as you need, with photos or drawings. We aim to reply within one business day.